{"odata.metadata": "FIXME", "value": [{"_id":1,"request_id":1094101,"permit_number":"10CBP0426","inspection_scheduled_date":"2019-05-18","estimated_inspection_arrival_time":null,"address":"1525 OCEAN AVE\nSANTA MONICA, CA 90049","inspection_type":"1070 Rough-Electrical","description":"New 4-Story Hotel, Building A is 1515 Ocean Ave and Building B is 1530 2nd St. Ground Floor Retail and Hotel Rooms on Floors 1 - 4 with Bridge over the Alley Conecting Buildings A and B at All Levels (208,425.00 SF), over Four Levels of Subterranian Parking in Building A.\n\n\n","inspector_assigned":"James Brewster","status":"FINAL","valuation":817150.0,"class_code":"213.0","class_code_description":"Hotels, Motels & Tourist Cabins ","inspection_request_date":"2011-05-13","inspection_request_time":null,"permit_issuance_date":"2010-05-05","permit_expiration_date":"2013-03-30","first_inspector":"James Brewster","last_inspector":"James Brewster","permit_type":"Commercial","permit_sub_type":"Building Combo"},{"_id":2,"request_id":1399139,"permit_number":"12STP1077","inspection_scheduled_date":"2015-05-14","estimated_inspection_arrival_time":null,"address":"1700 MAIN ST\nSANTA MONICA, CA 90401\n(34.010827451, -118.491474095)","inspection_type":"1110 Final-Electrical","description":"Electrical (600 AMP MAIN SWITCH BOARD, TRANSFORMER, ELECTRIC PANELS, WALLS AND FOUNDATION","inspector_assigned":"James Brewster","status":"FINAL","valuation":0.0,"class_code":"329.0","class_code_description":"Structures Other Than Buildings ","inspection_request_date":null,"inspection_request_time":null,"permit_issuance_date":"2012-06-07","permit_expiration_date":"2013-02-14","first_inspector":"James Brewster","last_inspector":"James Brewster","permit_type":"Commercial","permit_sub_type":"Patio Cover"},{"_id":3,"request_id":1628915,"permit_number":"14CBP0285","inspection_scheduled_date":"2015-05-30","estimated_inspection_arrival_time":null,"address":"2902 NEBRASKA AVE\nSANTA MONICA, CA 90277","inspection_type":"1050 Rough-Building","description":"Tenant improvement- Existing footprint is not modified. Inside existing space, new areas to be built are: accessible restroom (1), color grading suite 1, color grading suite 2, and meeting room. Existing spaces to be remodeled are: entry/ reception, Communal work space, machine room, lounge/ lunch room, accessible restroom (2), and electrical room. Eleven (11) parking spaces are provided including one accessible space. Four (4) exterior bicycle parking spaces and seven (7) interior bicycle parking spaces are provided per the Bergamot Area Plan Requirement.\nOTC - 2902 Nebraska Ave. Revision to 4/18/14 - Change sanitary piping to ABS. \nRev.14CBP0285;Site improvements to parking and east exiting to meet accessible requirements.","inspector_assigned":"James Brewster","status":"Finaled","valuation":331875.0,"class_code":"437.0","class_code_description":"Add or Alter All Other Buildings & Structures ","inspection_request_date":"2014-05-29","inspection_request_time":null,"permit_issuance_date":"2014-04-11","permit_expiration_date":"2015-05-04","first_inspector":" DEREK","last_inspector":"James Brewster","permit_type":"Commercial","permit_sub_type":"Building Combo"},{"_id":4,"request_id":1721550,"permit_number":"14CBP0444","inspection_scheduled_date":"2015-01-02","estimated_inspection_arrival_time":"08:00:00","address":"826 WILSHIRE BLVD\nSANTA MONICA, CA 90265","inspection_type":"1070 Rough-Electrical","description":"Comprehensive facade remodel & office TI project to update the building to contemporary materials & style & provide ADA compliant restrooms, office & conference room. new roof to replace existing roof. removal & replacement of storm line underneath existing sidewalk. removal of existing second story with net reduction of 397 s.f.","inspector_assigned":"David Mulick","status":"ISSUED","valuation":1000001.0,"class_code":"437.0","class_code_description":"Add or Alter All Other Buildings & Structures ","inspection_request_date":"2014-12-19","inspection_request_time":"12:33PM","permit_issuance_date":"2014-06-04","permit_expiration_date":"2015-05-26","first_inspector":"David Mulick","last_inspector":"David Mulick","permit_type":"Commercial","permit_sub_type":"Building Combo"},{"_id":5,"request_id":1721551,"permit_number":"14CBP0444","inspection_scheduled_date":"2015-01-02","estimated_inspection_arrival_time":"08:00:00","address":"826 WILSHIRE BLVD\nSANTA MONICA, CA 90265","inspection_type":"1050 Rough-Building","description":"Comprehensive facade remodel & office TI project to update the building to contemporary materials & style & provide ADA compliant restrooms, office & conference room. new roof to replace existing roof. removal & replacement of storm line underneath existing sidewalk. removal of existing second story with net reduction of 397 s.f.","inspector_assigned":"David Mulick","status":"ISSUED","valuation":1000001.0,"class_code":"437.0","class_code_description":"Add or Alter All Other Buildings & Structures ","inspection_request_date":"2014-12-19","inspection_request_time":"12:34PM","permit_issuance_date":"2014-06-04","permit_expiration_date":"2015-05-26","first_inspector":"David Mulick","last_inspector":"David Mulick","permit_type":"Commercial","permit_sub_type":"Building Combo"}]}